Testimonials
MEP Building Services
I would like to thank you and the team of Forsspac on this very complex project. I have never in my experience heard of a complete AC, Electrical room and Fire protection system used inside what is ultimately a tent.
However, from the inside it is far from a normal tent.
The trial of the changes that were needed to ensure that the Chairman had delivered what was requested and to codes was challenging. Obviously with all the changes to make it work and to a budget.
We had a few problems. But working together we managed to achieve the required goal with Forsspac assistance with at times impossible time frames.
But in the end working together as one team the goal was achieved and everyone was amazed and happy with the result.
- Edward Hobbs,
Senior Project Director
However, from the inside it is far from a normal tent.
The trial of the changes that were needed to ensure that the Chairman had delivered what was requested and to codes was challenging. Obviously with all the changes to make it work and to a budget.
We had a few problems. But working together we managed to achieve the required goal with Forsspac assistance with at times impossible time frames.
But in the end working together as one team the goal was achieved and everyone was amazed and happy with the result.
- Edward Hobbs,
Senior Project Director
2D CAD Drafting
Project – Caboolture-Bribie Island Road to Steve Irwin Way Upgrade.
Acciona engaged Forsspac to provide 2D CAD Drafting to As-Constructed status from Redline comments.
I found the team we worked with (Rey, Alvin & Brent) to be professional, proactive and delivered works required on time and to a high quality.
I would have no hesitation in recommending them and look forward to continuing to work with Forsspac in future projects.
- Leanne Ide.
Quality Manager at Acciona
Acciona engaged Forsspac to provide 2D CAD Drafting to As-Constructed status from Redline comments.
I found the team we worked with (Rey, Alvin & Brent) to be professional, proactive and delivered works required on time and to a high quality.
I would have no hesitation in recommending them and look forward to continuing to work with Forsspac in future projects.
- Leanne Ide.
Quality Manager at Acciona
T&C services
The success of the most recent project of Rockwell Land Corporation in Makati City, the Proscenium, would not have been possible without the help of Forsspac who helped test and commission all our core services equipment to ensure that these are working according to the designed specifications and required code and safety standards. Forsspac is also proactive in following up with our contractors, monitoring and meeting them every week to ensure the project schedule and desired quality parameters are met. We would definitely recommend Forsspac in our future projects.
- Robert G. Baldoza.
Senior EE Manager Project Development
- Robert G. Baldoza.
Senior EE Manager Project Development